Announcement

Collapse
No announcement yet.

Changi T5 Contruction contracts awarded

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Changi T5 Contruction contracts awarded

    Details in the link below
    https://www.straitstimes.com/singapo...-4-75b-awarded

  • #2
    Exciting to know that T5 construction is now well underway.

    As for the design of T5, I have mixed feelings about the aesthetics of the terminal, purely about how it looks: The design looks like someone laid A4 sheets of paper in the shape of a terminal building.

    The T5 design is quite unique and striking, but at least to me, it doesn't soar and inspire the way the best terminal designs do, purely in aesthetic terms. That said, neither do the designs of T2/T3/T4, which are very functional, but not very interesting, design-wise. Maybe I will feel differently when I see it in real life.

    Comment


    • #3
      Originally posted by yflyer View Post
      As for the design of T5, I have mixed feelings about the aesthetics of the terminal, purely about how it looks: The design looks like someone laid A4 sheets of paper in the shape of a terminal building.
      My thoughts exactly. There was an earlier rendering when it was first announced which look more inline with that the other terminals look.

      Comment

      Working...
      X