operations will be extended by 2.5 hours from 05.00 local time to 00.30 local time. At current, the airport operates between 06.00 local time and 23:00 local time, or up to midnight as and when needed.
In addition it will built a 3,500m third runway, as well as extend its second runway,16L/34R, by 1,000m to 3,500m.
Leave a comment: