Here is the new T3 which is under construction at the moment. The current T3 will be revamped to connect to this new terminal. These pictures are taken from the AP2 website.
Once T3 is completed, T2 and T1 will also be revamped. A main building that connects the 2 terminals will be built to house a common check-in area and a city - airport rail link station.
All 3 terminals will be connected by a Skytrain.
Please see this youtube link on the renovation project of CGK:
I had to laugh when I saw the big banner at T3 last week. I should have taken a picture but the thing that got me was the train line exiting the new T3 with the train being something like a French AGV.
Comment