    By Hal Weitzman in Chicago

    Published: March 19 2008 18:02 | Last updated: March 19 2008 18:02

    Boeing admitted on Wednesday that it would have to redesign parts of its troubled 787 Dreamliner, raising the prospect of a third delay in recent months to delivery of the new aircraft.

    The company’s comments came in response to a warning from Steven Udvar-Hazy, chairman of International Lease Finance Corporation (ILFC), the 787’s biggest customer.

    Hazy told a JPMorgan Chase conference that the state of the Dreamliner programme was “not pretty”. He said first deliveries would be delayed for at least another six months because its centre wing box – which holds the wings in place – needed to be redesigned.

    http://www.ft.com/cms/s/0/59b8e998-f...077b07658.html

  • #2
    Boeing admits Dreamliner rethink

    I worry about the spin behind the A350/787. They are composite aircraft after all. Concerns include:
    Easily damaged by handling equipment on the ground
    Harder to spot damage on visual inspections
    Durabilty as good as present a/c? Can they fly for 20 years?

    The safety record of current a/c with composite parts is not 100%. Composite rudders failing...

    Beechcraft Starship was an all composite a/c that was withdrawn because of poor economics..

    Comment


    • #3
      Expect Boeing to start discounting 777's to make up for customers lost capacity...
      ...Because The Sky Is A Canvas, Waiting For A Masterpiece...

      Comment


      • #4
        Originally posted by 9V-SIA View Post
        I worry about the spin behind the A350/787. They are composite aircraft after all. Concerns include:
        Easily damaged by handling equipment on the ground
        Harder to spot damage on visual inspections
        Durabilty as good as present a/c? Can they fly for 20 years?

        The safety record of current a/c with composite parts is not 100%. Composite rudders failing...

        Beechcraft Starship was an all composite a/c that was withdrawn because of poor economics..
        Aluminum is very easily damaged by ground equipment. I believe it's harder and more expensive to repair than the composite stuff.

        Durability as good? Try twice as good. That's one of the major selling points. They're supposed to have a useful life of 60-70 years, compared with about 30 years for similar aluminum aircraft.

        Very sad to see the 787 project described as "troubled." Maybe Boeing needs to hire back Alan Mullaly.

        Comment


        • #5
          Boeing redesigns 787 center wing box, no further delay confirmed

          ATW Daily News

          Boeing redesigns 787 center wing box, no further delay confirmed

          Friday March 21, 2008
          Boeing admitted yesterday that it has "found the need for some improvements" on the 787, specifically in the center wing box, and that the fixes are underway for those aircraft undergoing assembly.

          The company did not confirm whether the extra work would result in another delay. "It is a normal part of the development of a new airplane to discover need for improvements, and that is what we are experiencing on the 787," a Boeing spokesperson said in an e-mailed statement.

          "Boeing is working its normal processes for developing a new airplane. The test process is working when issues are discovered and we are reacting appropriately by implementing normal design validation and fixes when we find issues," the statement continued, adding that "the center wing box issue has been addressed." The manufacturer said the fix is being installed on six 787s at its Everett factory, four of which are in final assembly. The solution will be incorporated from the start for the seventh aircraft and beyond.

          The statement followed a story in the Financial Times in which a Boeing spokesperson acknowledged "some redesign work" in the wake of comments from ILFC Chairman and CEO Steven Udvar-Hazy at this week's JPMorgan Transportation and Aviation Conference in New York. The leader of the world's largest aircraft lessor said the state of the 787 program was "not pretty" and that he anticipated a further six-month delay as a result of problems with the center wing box, which were unidentified. The Boeing spokesperson told FT that "things are more complex than what [Udvar-Hazy] said."

          Boeing is expected to update the 787's progress and announce a delay, if any, in late March/early April. Two weeks ago, Goldman Sachs issued a client note indicating that some sources believed a further three-month delay would push first delivery back to the 2009 third quarter (ATWOnline, March 10).

          by Brian Straus and Geoffrey Thomas

          http://www.atwonline.com/news/story.html?storyID=12134