#16 |
SQTalk PPS Club
Join Date: 01-Aug-2012
Posts: 279
|
![]() The Apron will be affected as well, mainly by the proposed works for the tunnel connections (People Mover and Baggage) to the future T5 Terminal and the extension of the MRT from T2 to T5. Works were originally scheduled to start later this year.
|
![]() |
![]() |
![]() |
#17 |
SQTalker
Join Date: 03-Jul-2018
Location: Singapore
Programs: SQ, AY, AF
Posts: 44
|
![]() Are you sure that the project will have the extension of the MRT from T2 to T5? According to plans, doesn't seem to have it, other than the Cross Island Line/Thomson-East Coast Line to T5.
|
![]() |
![]() |
![]() |
#18 | |
SQTalk PPS Club
Join Date: 22-Nov-2018
Programs: KF nothing
Posts: 286
|
![]() Quote:
Who knows, if they're going to have to tunnel for the Skytrain, they could probably decide to provide an extension for the MRT as well. Having to use different lines from the CBD to each terminal precinct could end up being pretty disastrous. |
|
![]() |
![]() |
![]() |
#20 |
SQTalk PPS Club
Join Date: 22-Nov-2018
Programs: KF nothing
Posts: 286
|
![]() That's the eventual plan with T5, but we'll need to do something in the meantime.
If not for the fact that BA and QF already made significant investments in T1, they could move to T2, and allow SIA's T2 operations to move to T1 as well, but do all check in in T3. Then as far as possible, you'd assign C pier gates to SIA group airlines. |
![]() |
![]() |
![]() |
#21 | |
SQTalk PPS Club
Join Date: 01-Aug-2012
Posts: 279
|
![]() Quote:
BUT, CAG tender for the People Mover and baggage tunnel were put on hold in march 2019, this may have an (time) impact onto LTAs works in that area. |
|
![]() |
![]() |
![]() |
#22 |
SQTalk PPS Club
Join Date: 22-Nov-2018
Programs: KF nothing
Posts: 286
|
![]() My understanding of contract T316 is that it should be a TEL project. So it's more likely that T316 involves extension of TEL from Sungei Bedok to T5.
|
![]() |
![]() |
![]() |
#23 | |
SQTalk Solitaire PPS
Join Date: 18-Aug-2009
Location: Singapore
Programs: Royal Orchid Plus
Posts: 1,276
|
![]() Quote:
|
|
![]() |
![]() |
![]() |
#24 | |
SQTalk PPS Club
Join Date: 01-Aug-2012
Posts: 279
|
![]() Quote:
![]() Anyway, with the TEL being connected to Expo station it doesn't make much sense to construct a direct connection from Sungei Bedok to T5. Last edited by SQ025; 9th May 2019 at 03:05 PM.. |
|
![]() |
![]() |
![]() |
#25 | |
SQTalk PPS Club
Join Date: 22-Nov-2018
Programs: KF nothing
Posts: 286
|
![]() Quote:
http://erl-construction.blogspot.com...ension-to.html The link to Expo is done as an extension of the Downtown Line. That's why I said "do something in the meantime". Apparently T3 doesn't have a lot of widebody gates, which may be an issue once MI is fully reintegrated. |
|
![]() |
![]() |
![]() |
#26 |
SQTalk PPS Club
Join Date: 01-Aug-2012
Posts: 279
|
![]() |
![]() |
![]() |
![]() |
#27 |
SQTalk Elite Silver
Join Date: 13-Aug-2017
Posts: 55
|
![]() Does this mean that T5 will have three different MRT lines serving it? :O
|
![]() |
![]() |
![]() |
#28 |
SQTalk PPS Club
Join Date: 01-Aug-2012
Posts: 279
|
![]() Its a "we are thinking about it".
I dont see neither the Cross Island Line nor the Thomson Line getting directly connected to T5. After the MRT connection from T2 into T5 is completed, there would be no logical (and econmical) sense to connect the other lines to T 5 only. |
![]() |
![]() |
![]() |
#29 |
SQTalk PPS Club
Join Date: 22-Nov-2018
Programs: KF nothing
Posts: 286
|
![]() I think they would have to solve the structural issues of the existing EWL Changi Airport station being incompatible with 5 door TEL (and potentially CRL) trains. There's also the question of the planned CRL route passing through Changi Airfreight Centre and missing the T1/2/3 area. (see http://crl-construction.blogspot.com...contracts.html)
I don't see it working without them building a separate station for TEL at T1/2/3, creating a situation like Heathrow Central where the HEx/Elizabeth Line and Tube stations are apart and built in separate eras. Alas, I do not have $300 to buy the tender documents... this is terribly confusing since I'm getting all kinds of mixed signals. Last edited by yuuka_miya; 9th May 2019 at 10:52 PM.. |
![]() |
![]() |
![]() |
#30 | |
SQTalk PPS Club
Join Date: 01-Aug-2012
Posts: 279
|
![]() Quote:
The Cross Island Line Phase 1 Prequalification has also started. Tenders will be expected to be out in the 2nd half of 2019. The link from the CRL to T5 is currently not part of the contract CR102 works. I agree that there are various sources suggesting that TEL as well as CRL may get connected to T5. But the actual URA masterplan draft 2019 is not showing these future connections. (Reference: https://www.ura.gov.sg/Corporate/Pla...ts/East-Region) |
|
![]() |
![]() |
![]() |