Announcement

Collapse
No announcement yet.

Thai Authorities closing Saphan Taksin BTS station!

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Thai Authorities closing Saphan Taksin BTS station!

    Madness, even if it was only supposed to be temporary.

    I would imagine the Hilton, Pen, Shangri-La, ROS and Oriental Hotels are less than impressed about this...

    Bangkok infrastructure.

    Bangkok Governor MR Sukhumbhand Paribatra, who inspected the station yesterday, said the installation of dual tracks will ease the flow of electric trains on the route.At the moment, a single track carries trains going both ways between the Bangkok and the Thon Buri sides of the Chao Phraya River, leading to bottlenecks.

    The BMA would solve the problem by laying another track through where the station's platform is built.

    The BMA will build a moving walkway, or "walkalator", to carry commuters from Saphan Taksin station to Surasak station 700 metres away once the station has been dismantled.

    Earlier, the BMA sought permission from the Rural Roads Department to expand Sathon Bridge to accommodate the installation of another track and keep Saphan Taksin station.

    However, the department rejected the request.

    The BMA and Bangkok Mass Transit System Plc (BTS) later agreed to remove Taksin station to accommodate the twin tracks.

    The station serves 50,000-70,000 commuters a day.

    The additional track will cost 70 million baht and the walkalator will cost 600 million baht.

    The Bangkok Council has approved a budget for them and the work can start once the Interior Ministry gives the BMA the go-ahead.

    "Without Taksin station, electric trains from the extended line [in Thon Buri] will be able to cross the Chao Phraya River faster, which will be more convenient for people from the Thon Buri side," MR Sukhumbhand said.

    The bottleneck at Saphan Taksin station has slowed train traffic, especially during peak hours.

    Close cooperation between the BMA and BTS led to the decision to dismantle the platform. The station belongs to the company.

    The governor also inspected the construction of an elevated walkway at Wong Wian Yai station.

    http://www.bangkokpost.com/news/tran...removal-begins

  • #2
    700 metre moving walkway? insane!
    My SQ and flying Videos: Youtube My Travel Blog: AussieFlyer.net

    Comment


    • #3
      Crazy! And just when will this walkway be completed? TIT!
      HUGE AL

      Comment


      • #4
        And when it is completed for exactly how many minutes will it work for before it breaks down.

        Comment


        • #5
          Originally posted by Lobster View Post
          And when it is completed for exactly how many minutes will it work for before it breaks down.
          HUGE AL

          Comment

          Working...
          X